Hot Water Cylinder News

Elson Replacement

05.10.2016 Elson Replacement Solution Saves Time & Money

When a London Borough was looking to replace the now discontinued Elson rectangular hot water storage tanks, which were coming to the end of their working life, they called upon McDonald Engineers UK’s expertise in manufacturing bespoke hot water storage solutions, to achieve exact replacements of the existing units.

The rectangular tanks were originally designed as space saving solutions to fit snugly within tight spaces, such as airing cupboards and loft spaces.

1000 litre calorifier and two 5000 litre buffer vessels

29.09.2016 Biomass Hot Water Storage for College

McDonald Engineers UK has designed, manufactured and supplied a hot water storage solution for a major college in Scotland comprising of a 1000 litre calorifier and two 5000 litre buffer vessels to work in conjunction with a biomass facility.

The college was looking to convert its existing open vented calorifier system to incorporate Biomass energy and approached McDonald Engineers UK to assist with the project.

10.08.2016 Unvented Hot Water Cylinder Training Course

McDonald Engineers is organising another of its highly popular Powerflow Unvented Cylinder training courses on 21st September 2016.

The BPEC Certified Unvented Cylinder training course enables all plumbers and installers of unvented cylinders to fulfil their legal obligation to complete the course every 5 years.

The course provides delegates with a complete understanding of Parts P and J of the Building standards as well as allowing them to identify typical faults associated with the installation and maintenance of unvented hot water storage systems.

Healing Powers of Copper

05.07.2016 The Healing Powers of Copper

It appears that the powers of copper are now being harnessed and used in orthotic insoles to deliver significant health benefits.

Not only can the Original Copper Heeler insoles help aching feet, sore joints and swollen legs, it appears the regular use of these products can have a far greater impact on your physical health and well-being.

Calorifier for Queens Theatre London

05.05.2016 Bespoke Calorifier With U Tube Battery Wins The Show

McDonald Engineers UK has upstaged the competition by manufacturing two copper Calorifiers for ‘The Queens Theatre’ in London with a U-Tube battery and bespoke finish as specified by the client.

The two 550 litre Calorifiers required for the prestigious theatre, which has played host to Les Misérables since 2004, were powered via a 120kW U-Tube Battery complete with lifting ring to allow the heating element to be easily removed for maintenance or indeed replaced.